Page 2 of the Workreports LVLC archive.

[LVLC] New Logcars (part 2)

Posted by Gerd on Tuesday, 21 May 2019 (Comments Closed)

Let’s continue with the logcars. Unfortunately, I forget to make pictures of the assembling part. The couplers are screwed to pieces of thin plywood together with the cover plate from brass. This sub-assembly is glued into the pockets at the end of the center beam. the log bunks are also glued into place. all wooden […]

[LVLC] More Logcars (part 1)

Posted by Gerd on Tuesday, 14 May 2019 with 2 Comments

Hello, since the exhibition in Lille has passed, I’m back on my garden railroads. When I introduced my 3-truck Shays some while ago, I noted the need of mode skeleton log cars to run longer trains. I spend a lot of thinking, using the same pattern from the first cars, or a different one. Finally […]

[LVLC] New Shays at Ronja Springs

Posted by Gerd on Tuesday, 12 March 2019 with 3 Comments

Hello Shay-lovers, one year ago, I got the chance to buy another Shay for my garden railroad, a Bachmann Spectrum Class C 3-truck Shay. Once arrived, I re-lettered her several times for different railroads and swapped between wood and oil burner multiple times. And I was never sure how to add this loco into my […]

[LVLC] Woodburning Climax

Posted by Gerd on Tuesday, 24 July 2018 (Comments Closed)

Good morning, since I got the two Bachmann “geared steamers”, many years ago, I was in trouble with two different fuel types on a single logging railroad. While the Shay was equipped with a wood load, the Climax was a coal burner. Now I found the time to rebuild the Climax as well. I still […]

[LVLC] adjusting the log car length

Posted by Gerd on Tuesday, 10 July 2018 with 1 Comment

Hello, since I seem to be in “Logcar-buliding-mode” at the moment, I just switched scale and spend some attention on my 1:20.3 skeletons. I original build them with 18′ length to make them suitable on 3′ radius curves. Since I moved on to 4′ radius, I did some test runs if I can enlarge my […]

[LVLC] Sawmill construction stopped – Climax back in service

Posted by Gerd on Tuesday, 10 October 2017 (Comments Closed)

Good morning, since I started to realize, how big my small sawmill will become, I came to a very import question – where to store the sawmill once finished? Since I don’t have spare room at the moment to store such a huge construction, I decided to take a break on the sawmill project. We’re […]

[LVLC] Finding the footprint (size) – Sawmill #2

Posted by Gerd on Tuesday, 3 October 2017 with 1 Comment

The template from last week worked very well and the following timber frames were assembled with half an hour each. With the five frames done, I figured out how big my sawmill will be. The main building will be 85cm by 50cm (33.5″ by 19.5″) with the log deck and carriage loading outside of the […]

[LVLC] Preparing the sawmill construction #1

Posted by Gerd on Tuesday, 26 September 2017 with 1 Comment

After some research, I found a nice prototype sawmill, which will be used to build the Louise Valley mill. The Pine Ridge Lbr.Co. was a very small logging operation in California’s Sierra Nevada. The mills output was rough cut timber only, which got sold to the nearby …. The lumber was send down to the […]

[LVLC] Sawmill kit by Garden Textures

Posted by Gerd on Tuesday, 19 September 2017 with 2 Comments

Hello, some while ago, I found this sawmill kit on eBay. It’s in new and unbuilt condition and after a check, all parts are there. It’s a basic mill with a simple interior, but such kits allow a lot of customizing and bashing. After a first view to the plans, I’ll stretch the whole mill […]

[LVLC] We’re knitting some water piping – Dolbeer part 3

Posted by Gerd on Tuesday, 29 August 2017 with 2 Comments

Hi folks, before I proceed with the next set of details part, I decided to give all components a basic coat of paint, since its hart to paint them, once the details are in place. Later, I’ll spend a weathering to the whole Steam Donkey. The last bag of parts holds the water piping between […]